A 240,000 sq.ft industrial facility built for MOTHERSON AUTOMOTIVE TECHNOLOGIES & ENGINEEING at Biradwadi, Chakan, Pune. This project demonstrates Prarambh Industries capability in delivering large-scale manufacturing infrastructure with precision and quality.
The client required a 240,000 sq.ft precision manufacturing plant within a tight schedule while operations at the adjacent Plant-1 continued uninterrupted. Challenging black cotton soil conditions at Biradwadi demanded deep piling and heavy-duty floor design, with zero tolerance for settlement under loaded machine foundations.
Prarambh Industries mobilised a dedicated EPC team and ran parallel work streams — piling, structural steel erection, roof sheeting and MEP — on overlapping critical paths. Deep bored piles and reinforced raft foundations were deployed to counter soil variability, and a lean planning cadence kept site logistics clear while the neighbouring plant stayed operational.
The facility was handed over on schedule, achieving Indian Green Building Council (IGBC) certification with a structural system engineered for heavy presses and automated assembly lines. The client scaled up to a second adjacent phase on the strength of this delivery.
Structural design of steel portal frames and foundations.
Deep bored piling and raft foundations for weak soil.
Fabrication and erection of 1,250 MT of steel.
Insulated sandwich-panel envelope.
Electrical, plumbing, fire and ventilation systems.
Piling layout frozen after borehole analysis.
Bored piles driven across the building footprint.
Portal frames erected in parallel with masonry.
Insulated roof, wall cladding and heavy-duty floors.
Utilities commissioned and plant handed over.